Arrived at Brinkerhoff job site and set up material in Unit A for finish work. Unit A: installed faucet, shut off water, installed angle stops, turned water back on and checked for leaks; installed basket strainer and P-trap, ran water to test the drain. Moved to Unit B: installed faucet, installed angle stops, checked angle stops for leaks, installed basket strainer and P-trap, ran water to test the P-trap and drain. Cleaned the job site.
| Person | Role | Hours |
|---|---|---|
| Chris | plumber | — |
| Qty | Material |
|---|---|
| Faucet (Unit A) | |
| Angle stops (Unit A) | |
| Basket strainer (Unit A) | |
| P-trap (Unit A) | |
| Faucet (Unit B) | |
| Angle stops (Unit B) | |
| Basket strainer (Unit B) | |
| P-trap (Unit B) |
Check first: customerName, jobDescription, labor[0].hours, labor[0].role, materials
As filed by the foreman
No typed description.
Recording & transcript
Clip 1 · 62s · transcript done
Job site Brinkerhoff, contractor Cali, foreman Chris. Arriving today, set up material in Unit A, set up to do finish. Installed faucet and turned off water, installed angle stops, turn water back on, check for leaks. Installed basket strainer, installed P-trap, ran water to test drain. After that, move to Unit B, install faucet, install angle stops, check for leaks on the angle stops, install basket strainer, install P-trap, ran water to test P-trap, to test the drain, clean the job site, and done.