2026-08-20 · rough · approved

Approved. Ready to send to QuickBooks.

Extracted fields

Brought tools down. Installed a check valve on the fire sprinkler line that kept shooting water. Installed a new fire sprinkler head. Drilled the hole for the unistrut and poured a cement support. Tested everything, turned water back on, cleaned up.

PersonRoleHours
plumber4.5
helper4.5
QtyMaterial
10FT1-1/2" galvanized pipe
(1)1-1/2" brass check valve
(1)3" x 2" galvanized tap tee
(1)1" galvanized close nipple
(1)Fire sprinkler head

Check first: labor[0].timeIn, labor[0].timeOut, labor[1].hours, labor[1].timeIn, labor[1].timeOut, materials[0].quantity, materials[0].description, materials[2].description, materials[4].quantity, materials[4].description

As filed by the foreman

Brought tools down. Installed a check valve on the fire sprinkler line that kept shooting water. Installed a new fire sprinkler head. Drilled the hole for the unistrut and poured a cement support. Tested everything, turned water back on, cleaned up.

PersonRoleInOutHours
(not stated)plumber8:0012:304.5
(not stated)helper4.5
QtyMaterial
10FT1-1/2" galvanized pipe
(1)1-1/2" brass check valve
(1)3" x 2" galvanized tap tee
(1)1" galvanized close nipple
(1)Fire sprinkler head

Recording & transcript

Clip 1 · 13s · transcript done

Hello, I'm recording. Is this working?

Clip 2 · 1s · transcript done

Clip 3 · 81s · transcript done

Daily report for Kenny. The job at 1369 Oak Creek, fire sprinkler work, rough job. We brought the tools down. Oh, I was already saying daily report for Kenny. The job at 1369 Oak Creek, fire sprinkler work, rough job. We brought the tools down. Installed a check valve on the fire sprinkler line that kept shooting water. Installed a new fire sprinkler head. And yeah, that was it. Uh, continuing, we drilled the hole for the unistrut and poured a cement support. Tested everything, tested the water heater back on, cleaned up. Labor was $8. To 12:30, 4 and a half hours, and my helper. Some 4 and a half materials: 10 feet, uh, 10 inch and a half galvanized pipe, 1 inch and a half brass check valve, and 1 3 by 2 galvanized tap tee, and 1 inch galvanized closed nipple. Done.