Brought tools down. Installed a check valve on the fire sprinkler line that kept shooting water. Installed a new fire sprinkler head. Drilled the hole for the unistrut and poured a cement support. Tested everything, turned water back on, cleaned up.
| Person | Role | Hours |
|---|---|---|
| — | plumber | 4.5 |
| — | helper | 4.5 |
| Qty | Material |
|---|---|
| 10FT | 1-1/2" galvanized pipe |
| (1) | 1-1/2" brass check valve |
| (1) | 3" x 2" galvanized tap tee |
| (1) | 1" galvanized close nipple |
| (1) | Fire sprinkler head |
Check first: labor[0].timeIn, labor[0].timeOut, labor[1].hours, labor[1].timeIn, labor[1].timeOut, materials[0].quantity, materials[0].description, materials[2].description, materials[4].quantity, materials[4].description
As filed by the foreman
Brought tools down. Installed a check valve on the fire sprinkler line that kept shooting water. Installed a new fire sprinkler head. Drilled the hole for the unistrut and poured a cement support. Tested everything, turned water back on, cleaned up.
| Person | Role | In | Out | Hours |
|---|---|---|---|---|
| (not stated) | plumber | 8:00 | 12:30 | 4.5 |
| (not stated) | helper | 4.5 |
| Qty | Material |
|---|---|
| 10FT | 1-1/2" galvanized pipe |
| (1) | 1-1/2" brass check valve |
| (1) | 3" x 2" galvanized tap tee |
| (1) | 1" galvanized close nipple |
| (1) | Fire sprinkler head |
Recording & transcript
Clip 1 · 13s · transcript done
Clip 2 · 1s · transcript done
Clip 3 · 81s · transcript done
History
| 8/20/2026, 9:13:08 PM | approve | Jessica Ruiz |
| 8/20/2026, 9:12:59 PM | accept extraction | Jessica Ruiz |